Ace Engineering Consultants Services
HVAC (Heating, Ventilation & Air-Conditioning):
- Cooling load calculations.
- Centralized chilled water system (Air Cooled / Water Cooled).
- Chilled Ceiling Technology.
- Energy conservation study & design.
- VRV’s / VRF’s system for residential & commercial buildings.
- Mechanical Ventilation for Car Parking & Basement area.
- Cold Storage refrigeration system design.
- Clean Room Environment technolgy.
- Design of Warehouses & Industrial Ventilation System.
- PPassive natural ventilation design.
- TheThermal Storage System Design.
Electrical System / IBMS System:
-
Electrical Substation of 33 KV & 11KV installation.
- Power transmission & distribution.
- DG set back-ups & synchronized operations.
- Power cabling.
- Security, access control and CCTV camera system.
- Audio visual systems.
- Building Automation system.
- Emergency & Exit Lighting.
- General Lighting system.
- Lighting Protection system.
- Telephone & TV system design.
- FirFire Detection & Alarm System.
Environmental Engineering Services:
-
Water & waste water process Engineering.
- Subdivision site planning. Water resources design.
- Industrial Waste Water Management.
- Storm water management / Rain Water Harvesting System.
- Water distribution & sanitary collection system.
- STP / UG / OH Tank System.
- Water & sanitary rehabilitation services.
- Water & sewerage piping design.
- Waste Diversion system.
- FloFlow Monitoring System.
Fire Protection System:
-
Fire Detection & Alarm System.
- Fire Hydrant & Hose Reel System.
- Fire Sprinkler System.
- Gaseous Protection System.
- Smoke Control System.
- Portable Fire Extinguisher.
- Dry Chemical System.
- Foam System.
- SpeSpecial Hazard Fire Protection Design.
Ace Engineering Consultants Functioning Methodology:
Predesign Stage:
-
Survey of place for installation.
- Inputs from client, Architect and Project Manager.
- BasiBasic Data Fixation.
Design Stage:
-
Area Calculation.
- Estimation of load requirements based on internal layout & other design inputs
from client’s end.
- Preparation of DBR suggesting feasible schemes along with load summary, unit
configuration, estimated cost and relative merits.
- Finalization of equipments location & utility requirements (e.g., water,
electrical loads, etc.) for the agreed scheme.
- PrepPreparation of layout drawings to facilitate provision of sleeves, cutouts etc.
during civil construction stage itself. Also space requirements (including
service requirements) for individual equipment can be finalized.
Tender Stage:
-
Preparation of tender documents including bill of quantities, specifications,
contract documents, etc. & inviting quotations.
- Negotiation based on commercial and technical parameters.
- PrepPreparing Pre GFC drawing.
Execution Stage:
-
Preparing GFC drawing.
- Approval of contractor’s working drawings & designs.
- Overall co-ordination with other agencies work.
- Quality inspection report.
- Testing the system as a whole to verify achievement of various parameters like
inside conditions, Power consumption, Capacity etc.
|
| |
| |